Beibo, China

30.12.2019
Shortly before the coronavirus lockdown began in China, we fitted a 2 MWp solar panel installation on the roofs of the glass manufacturer Beibo in less than 35 days. The installation could only be connected to the network in March, due to the delays caused when the whole of China locked down, but it has been working perfectly ever since.

Client

Beibo Glass Science

Location

Dingxi, Gansu

MWp

2

kWh

2.400.000

Roof surface

More than 10.000 m²

Duration

35 days

See what happened to the client’s roof

"It was the last big project in 2019, and the last project before Covid-19 struck mercilessly. Now, a few months later, we are back up to full capacity and that also means that we are powered almost entirely by green electricity!”

Zhonglin Wang
Owner of Beibo

Thank you, Beibo, for your confidence in us!