In the last quarter of 2019, we installed no less than 19 Mwp in parallel, with a total of almost 250 fitters on the different roofs. 3 MWp, or about 9,000 solar panels, were installed on Gonglue’s roofs. The total time needed to install them was less than four weeks.

Client

Gonglüe Trading Co., Ltd.

Location

Shijiazhuang (Hebei)

MWp

2

kWh

2.400.000

Roof surface

More than 10.000 m²